Topic: POES EL: JD 139 Daily Report
Date/Time Issued: May 20, 2025 0506Z
Product or Data Impacted: NOAA L1b GAC Data
Date/Time of Initial Impact: See details below
Date/Time of Expected End: See details below
Length of the Outage/Event: N/A
Details/Specifics: JD 139 Daily Report
INVESTIGATE | Plan vs. Actual Check | Spacecraft Pass Plan | Antenna Site Schedule | |||||
Total Planned | Total Taken | NOAA-15 | NOAA-18 | NOAA-19 | ROOST | SVL | PAK1 | PAK4 |
50 | 42 | 17 | 17 | 16 | 3 | 42 | 2 | 3 |
Pass Statistics | 88% | 0% | 12% | |||||
Pass Counts | 37 | 0 | 5 | 37 | 5 | 0 | 0 | |
Operator Actions/ Intervention | Success | Failed | Marginal | GAC Rcvd | TSF Rcvd | Intervent'n Required | On Call Support Needed | GAC Start - Stop (UTC) |
Vehicle | Pass Plan | Pass Type | Load Notes | Operator | Workstation | IRON | Site | Julian Day | Date | AOS (UTC) | Date | LOS (UTC) | Rev Number | Max El (deg) | Pass Result | Operator Actions/ Intervention |
NOAA-15 | HRPT Downlink Only | On Console | String 2 | Operator | 5 | 25338 | Raven-1 | 25139 | 5/19/2025 | 14:11 | 5/19/2025 | 14:23 | 40540.3 | 47.73 | Marginal (HRPT received, GAC not received) | Contact initially deleted due to Maintenance. PEL Operator (D.Hale) added contact 20 minutes prior to AOS. Incorrect String at beginning of contact operator swtiched to matching string s and relauched contact ACU stopped tracking mid contact. Operator selected manual on Talon then Acquire which reinitiated tracking. HRPT and TSF were captured. |
NOAA-18 | HRPT, GAC, Encrypted CMD | Automated | String 1 | System | 5 | 28654 | SG185 | 25139 | 5/19/2025 | 16:23 | 5/19/2025 | 16:39 | 3079.1 | 67.79 | Marginal (HRPT received, GAC not received, DAU Reset verified) | GAC missed due to SCT at incorrect pointer after upload. PEL Operator to move SCT index to correct pointer on next contact |
NOAA-19 | HRPT, GAC, Encrypted CMD | Automated | String 3 | System | 5 | 33591 | SG189 | 25139 | 5/19/2025 | 16:26 | 5/19/2025 | 16:42 | 83915.1 | 79.98 | Marginal (HRPT received, GAC not received, DAU Reset verified) | GAC missed due to SCT at incorrect pointer after upload. PEL Operator to move SCT index to correct pointer on next contact |
NOAA-18 | HRPT, GAC, Encrypted CMD | Automated | String 1 | System | 5 | 28654 | SG185 | 25139 | 5/19/2025 | 18:04 | 5/19/2025 | 18:20 | 3080.1 | 84.05 | Marginal (HRPT received, GAC not received, DAU Reset verified) | Recorder management: SCPST (1A into Record) - XSUGS1B, XSUGS1A, XSUGR1A (3B Stop and place into BOM) - XSUGS3B, XSUBOM3B, XSUGS3B CPRST (03A1) |
NOAA-19 | HRPT, GAC, Encrypted CMD | Automated | String 3 | System | 5 | 33591 | SG189 | 25139 | 5/19/2025 | 18:08 | 5/19/2025 | 18:23 | 83916.1 | 71.12 | Marginal (HRPT received, GAC not received, DAU Reset verified) | Recorder management: SCPST (4b Stop and place into BOM) - XSUGS4B, XSUBOM4B, XSUGS4B (2A into Record) - XSUGS2B, XSUGS2A, XSUGR2A CPRST (03ED) |
Vehicle | IRON | Rev Number | GAC Rcvd | GAC Start - Stop (UTC) |
NOAA-15 | 25338 | 40540.3 | No | |
NOAA-18 | 28654 | 3079.1 | No | 139-14:37:35 - 139-16:27:54 (3B) |
NOAA-19 | 33591 | 83915.1 | No | 139-14:40:54 - 139-16:31:20 (4B) |
NOAA-18 | 28654 | 3080.1 | No | 139-16:17:52 - 139-18:08:29 (4B) |
NOAA-19 | 33591 | 83916.1 | No | 139-16:21:12 -139-18:12:09 (1A) |
Vehicle | IRON | Site | Julian Day | Rev Number | Pass Result | Operator Actions/ Intervention | GAC Rcvd | TSF Rcvd |
NOAA-15 | 25338 | Raven-1 | 25139 | 40540.3 | Marginal (HRPT received, GAC not received) | Contact initially deleted due to Maintenance. PEL Operator (D.Hale) added contact 20 minutes prior to AOS. Incorrect String at beginning of contact operator swtiched to matching string s and relauched contact ACU stopped tracking mid contact. Operator selected manual on Talon then Acquire which reinitiated tracking. HRPT and TSF were captured. | No | #N/A |
NOAA-15 | 25338 | PAK1 | 25139 | 40541.2 | Successful (HRPT received, TSF captured) | #N/A | Yes | |
NOAA-19 | 33591 | Raven-1 | 25139 | 83915.3 | Cancelled | Maintenance at Raven Antenna | #N/A | |
NOAA-15 | 25338 | PAK4 | 25139 | 40542.2 | Successful (HRPT received, TSF captured) | #N/A | Yes | |
NOAA-18 | 28654 | Raven-1 | 25139 | 3080.3 | Cancelled | Maintenance at Raven Antenna | #N/A | |
NOAA-18 | 28654 | PAK4 | 25139 | 3081.2 | Successful (HRPT received, TSF captured) | #N/A | Yes | |
NOAA-18 | 28654 | PAK1 | 25139 | 3082.2 | Successful (HRPT received, TSF captured) | #N/A | Yes | |
NOAA-19 | 33591 | PAK4 | 25139 | 83919.2 | Successful (HRPT received, TSF captured) | #N/A | Yes |
This notification was sent to ESPC.Notification@noaa.gov, a mailing list you are subscribed to. If you wish to unsubscribe, please contact
ESPC Help-Desk at ESPCOperations@noaa.gov requesting to "Unsubscribe". Please note: it may take up to two business days to process your unsubscribe request.
For any additional information you can reach ESPC at 301-817-3880 (24x7)