Topic: POES EL: JD 045 Daily Report


Date/Time Issued: June 9, 2025 1349Z


Product or Data Impacted: NOAA L1b GAC Data


Date/Time of Initial Impact: See far right column below


Date/Time of Expected End: See far right column below 


Length of the Outage/Event: N/A


Details/Specifics: Partial GAC / Missed GAC


Summary of Failed Passes:
Vehicle 
Pass Plan
Pass Type
Load Notes
Operator
Workstation
IRON
Site
Julian Day
Date
AOS (UTC)
Date
LOS (UTC)
Rev Number
Max El (deg)
Pass Result
Operator Actions/ Intervention
NOAA-19
HRPT, GAC, Encrypted CMD
Automated
String 3 Verify commanding
System
5
33591
SG189
25159
6/8/2025
3:45
6/8/2025
3:56
84164.2
9.39
Failed (HRPT not received, GAC not received, NOOOP to control and non control not verified)
Conflict with SG 109 and N19  got rejected on GSMP

Summary of Failed Passes:
Vehicle 
IRON
Rev Number
GAC Rcvd
GAC Start - Stop (UTC)
NOAA-19
33591
84164.2
No
01:56:24-03:47:33 (5A)


This notification was sent to ESPC.Notification@noaa.gov mailing list. If you wish to unsubscribe or subscribe to this list, please contact ESPC Help-Desk at ESPCOperations@noaa.gov with your request. Please note: it may take up to two business days to process your request. For any additional information you can reach ESPC at 301-817-3880 (24x7)